Seems like a long time to get the last few jobs done so we can launch. Tiller extension fitting. Getting the lead bulb fitted. Fitting the keel. All time hungry consumers. Fun though. I really enjoyed the electrics and getting them all working and looking neat and tidy. The heat shrink labels are brilliant. I’ll let the photos do the talking! Just quickly, the keel and lead bulb was a tricky bit of work, not that enjoyable. Had to outsource the lead melting, was not comfortable doing it in the garden!
Leave a Reply